The London Plan asks Redbridge for 1,409 homes a year. The council's own report counts 624 finished in 2024/25, with 4,422 more still under construction.
The short answer. We arrange development finance for East London: new build, conversions and heavy refurbishment, with Ilford and the rest of Redbridge in focus. East London sits inside our wider London development finance coverage. Loans start at £500,000. We have lenders that will go up to 70% LTGDV, for the right developer with the right track record. Indicative terms within about 24 hours. The council's figures show a wide gap between permissions and starts. The example below tests a nine-flat scheme at lower sale prices.
Redbridge Counts 624 Homes Finished Against a Target of 1,409
From the council's monitoring report, published September 2026, for the year to March 2025.
| Redbridge, 2024/25 | Figure |
|---|---|
| London Plan target, per year | 1,409 homes |
| Net homes completed | 624, which is 44% of target |
| Net homes granted permission | 1,302 |
| Net homes under construction | 4,422 |
| Starts recorded in the year | 342 (1,083 in 2023/24) |
The council says it cannot show a five-year housing land supply, and it calls for a new Local Plan. The gap between 1,302 permissions and 342 starts is the line to read. A consent tells you the council agreed. It does not tell you the sums work, so prove them before you bid.
Three Plans, Three Stages, and Only One Is Adopted
| Document | Where it stood on 3 November 2026 | What it means for a site |
|---|---|---|
| Redbridge Local Plan 2015 to 2030 | Adopted 15 March 2018. The council's page lists no draft of a new plan. Its March 2025 Local Development Scheme calls the review timetable indicative. | Decisions still rest on the 2018 plan, alongside the London Plan 2021. |
| Ilford Opportunity Area Planning Framework (the OAPF) | Consultation draft, September 2026. Consultation ran 16 September to 30 October 2026 and has closed. | A pointer, not policy. The draft says Ilford could deliver 6,000 homes by 2050. |
| Draft London Plan | Consultation July to 15 October 2026, now closed. The GLA lists examination in 2027 and adoption in early 2028. | Redbridge's ten-year target moves from 14,090 homes (2019/20 to 2028/29) to 16,130 (2027/28 to 2036/37), up 14.5%. |
Ilford Has the Elizabeth Line and Still Has Stalled Sites
The GLA lists Ilford as an Opportunity Area designated in 2004. It sits in the Elizabeth Line East growth corridor, and Crossrail at Ilford station is its key transport project. The draft OAPF says growth has still been slower than expected. Its own audit shows by how much.
| The draft OAPF's count for Ilford | Figure |
|---|---|
| Homes delivered since the 2018 Local Plan allocation | 784 |
| Allocated sites with no planning activity | around 15% |
| Developments that entered planning or construction and are now stalled | 31% |
| Pipeline homes commenced on site | 7.5% |
| Schemes over 6 storeys | Half stalled, none completed |
The draft blames scattered ownership, low values against construction costs, Building Safety Act requirements and infrastructure contributions. It adds that higher-density mid-rise may be a more deliverable route in the short to medium term. Its indicative heights are 8 to 16 storeys across the area, rising to 24 or more in the best-connected spots.
Our Ilford case study is a 15-storey tower, inside the draft's 8 to 16 storey band. It has 115 apartments with a GDV of £58.5m. The capital stack was £38m, with £24.5m of senior debt, structured with mezzanine and equity as one package on a 24-month programme. Read the Ilford tower case study.
What Limits an Ilford Site Before Finance Does
| Limit | What the source says | Check before you offer |
|---|---|---|
| Tall buildings | London Plan policy D9 sets a minimum of 6 storeys or 18 metres for a tall building. The draft OAPF says Ilford's town centre area is one of two zones where Redbridge's plan generally supports them. | Whether your site sits in a Tall Building Zone. |
| Flood | The draft OAPF lists ongoing flood risk among the threats to viability. GOV.UK defines Flood Zone 2 as a 1% to 0.1% yearly chance of river flooding. | The Environment Agency's flood map for your site. |
| Epping Forest | Part of the protected forest lies in north-west Redbridge. New homes within 6.2km pay £289.48 plus £1,993.57 each from 1 May 2026, indexed every year, plus an administration fee. | Whether your site is inside the zone, and today's figure. |
What a Home Sells For Across East London
HM Land Registry's September 2026 figures, provisional. Your exit starts with sold prices on your own street.
| September 2026 average | All homes | Change on the year | Flats | Flats, change |
|---|---|---|---|---|
| Redbridge | £493,066 | down 2.1% | £307,009 | down 4.7% |
| Newham | £391,492 | down 5.1% | £324,653 | down 6.6% |
| Barking and Dagenham | £372,551 | up 5.1% | £247,319 | up 2.6% |
| Havering | £443,269 | up 0.5% | £247,619 | down 2.2% |
Flats fell in three of the four boroughs.
Nine Flats in Ilford, Tested at Four Sale Prices
An illustration, not a real client. A two-director company has planning for nine flats in a mid-rise block. Nine is one under the point where the draft London Plan's affordable housing tables begin, so the example carries no affordable homes. Check your own position. Every cost is assumed.
| The scheme | Amount |
|---|---|
| Nine flats at £300,000 (GDV) | £2,700,000 |
| Site | £800,000 |
| Build, nine flats at £125,000 | £1,125,000 |
| Fees, conditions and contingency | £175,000 |
| Total cost | £2,100,000 |
| Left before finance and sales costs | £600,000, 22.2% of GDV |
| Development loan | £1,500,000, 55.6% of GDV and 71.4% of cost |
| The directors' own money | £600,000 |
The loan stays the same. Only the price moves.
| Price per flat | GDV | Left before finance and sales costs | Share of GDV | Loan as share of GDV |
|---|---|---|---|---|
| £300,000 (today's assumption) | £2,700,000 | £600,000 | 22.2% | 55.6% |
| £285,000 (5% lower) | £2,565,000 | £465,000 | 18.1% | 58.5% |
| £270,000 (10% lower) | £2,430,000 | £330,000 | 13.6% | 61.7% |
| £255,000 (15% lower) | £2,295,000 | £195,000 | 8.5% | 65.4% |
Redbridge flats were down 4.7% on the year, so the second row is not a thought experiment. A 10% price fall takes 45% of the margin. The scheme breaks even at about £233,000 a flat, before finance and sales costs. Inside the Epping Forest zone, the two charges on nine flats come to about £20,500 from 1 May 2026, before the administration fee, which the £175,000 line absorbs.
| Cost of the facility | Amount |
|---|---|
| Our fee: generally 1% of the gross loan, due on completion. On a complex case an application fee can apply, agreed in writing first | £15,000 |
| Lender's fee (lender fees typically 1% to 2%; 1% shown) | £15,000 |
| Valuation | £3,000 to £15,000 or more, sized to the scheme |
| Legal fees | £5,000 to £25,000 or more, sized to the scheme |
| Your own solicitor | Ask your own solicitor for a quote |
| Interest | Builds up monthly and is repaid at exit; your term sheet sets the rate |
| Monitoring surveyor | Generally £500 to £2,000, depending on the scheme |
Illustrative: every case is priced individually. Indicative terms are a guide, not an offer.
Credit-backed terms from about 5 working days at the quickest. Try your own figures in the development finance calculator, see today's development rates, and read our guide to development finance.
Our View
We read the council's table as an argument for testing price first. Permission is being granted and starts are not following, and the draft OAPF names low values against build costs as part of the reason. Before we talk about a loan, run your scheme at 5% and 10% below today's sold prices, as above. A scheme that survives the 10% row has a case worth sending us.
Questions From Ilford and Redbridge Sites
Does the Opportunity Area label change my loan?
No. It is a planning designation that says where homes are wanted. We look at your scheme, your sale prices and your record.
My scheme has seven storeys or more. What changes?
At 7 storeys or 18 metres, with two or more homes, a new building is higher-risk under GOV.UK's criteria.
Do you fund sites in Newham, Barking or Havering?
Yes. Each council has its own plan and its own charges, so bring the planning position for your site.
The council has no five-year housing land supply. Does that win me permission?
Redbridge says it reduces the weight given to its housing policies. It does not grant permission. Your application still needs a decision notice, and we start from that.
Got a site between Ilford station and the Roding? Send the planning decision, your costings, the GDV and the loan size.
For business or investment purposes only - never secured on a home you or your family live in.
Sources. (1) London Borough of Redbridge, Redbridge Local Plan Authority Monitoring Report 2024/25, September 2026, redbridge.gov.uk, read 3 November 2026. (2) London Borough of Redbridge, "Local plan" page (adopted 15 March 2018; Local Development Scheme March 2025), redbridge.gov.uk, undated, read 3 November 2026. (3) Greater London Authority, "Ilford Opportunity Area", london.gov.uk, undated, read 3 November 2026. (4) Mayor of London, London Borough of Redbridge and Transport for London, Ilford Opportunity Area Planning Framework, consultation draft, September 2026 (consultation 16 September to 30 October 2026), and Redbridge "Ilford OAPF consultation" page last updated 24 September 2026, read 3 November 2026. (5) Greater London Authority, The London Plan 2021, chapter 4 (Table 4.1) and chapter 3 (policy D9), london.gov.uk, read 3 November 2026. (6) Greater London Authority, Draft London Plan (2026), chapter 3 (Tables 3.1 to 3.3) and consultation page (closed 15 October 2026), london.gov.uk, read 3 November 2026. (7) London Borough of Redbridge, "Epping Forest special area of conservation", redbridge.gov.uk, undated, read 3 November 2026. (8) GOV.UK, Planning Practice Guidance, "Flood risk and coastal change", last updated 17 September 2025, read 3 November 2026. (9) GOV.UK, "Criteria for determining whether a new building that is being designed and constructed is a higher-risk building", last updated 28 May 2025, read 3 November 2026. (10) HM Land Registry, UK House Price Index, Redbridge, Newham, Barking and Dagenham and Havering, September 2026, provisional, via landregistry.data.gov.uk, read 3 November 2026. (11) developing.fund, "Ilford Tower", case study page, last updated 21 October 2026, read 3 November 2026.
Last updated